Poly B Pipe Replacement – Case Study #27

Home » Portfolio » Poly B Case Studies » Poly B Pipe Replacement – Case Study #27
Poly B Pipe Replacement – Case Study #27 2019-04-05T03:11:23+00:00

Project Description

Poly B Pipe Replacement – Case Study #27

In full disclosure Mr.Rob Black has got to be one of my personal most favourite persons of all time ( me being Graham Drew, Ceo) Chan, Taylor, and myself took on not only a full poly b replacement in Mr.Blacks house in Sierra Morena place we also renovated his master bathroom at the same time.

At Urban piping Ltd. our company does not just consist of only plumbers, but we have a full team of drywallers, tapers, mudders, painters, framers, and tilers. Having a full team on staff with no-one that is subcontracted is a major benefit, there is zero down time in our projects and we have full control over quality. Throughout this poly b replacement and master bathroom renovation Taylor had hurt his neck, it was to our delight that Rob Black owns a company called “Somatic Journeys” and is a certified FELDENKRAIS practitioner. He had Taylors neck fixed up in about an hour.

Robs two projects where able to be overlapped and only took about 13 days for both the polybutylene replacement and the bathroom renovation.

Poly B Pipe Replacement Photos Coming Soon

WP Feedback

Dive straight into the feedback!
Login below and you can start commenting using your own user instantly